This shows an example of an 18m steel bowstring footbridge, which after fabrication at Midcam, was painted ready for installation at a yacht club.
Steel Pontoons
These 11.985×2.89m steel pontoon frames are fabricated from 300x90m m channel and weigh approximately 2.5tonnes each, which is well within the lifting capacity of our in house crane.
Aluminium Footbridge
An example of an aluminium walkway fabricated by Midcam.
Aluminium Fingers
Another example of the aluminium work fabricated at Midcam.
Access Bridge
Hollow section truss access bridge for a marina.
Marina Footbridge
This footbridge was fabricated in 3 sections, with a lattice framework built to accept wooden decking and steel clad roof.
Tug Bridge
This 56m long bridge was constructed in two sections. It depicts an example of a typical project where Midcam worked with the customer to produce the finished design and shows the scale of some of the fabrication work that can be undertaken